Layout

Pumps, filters, electrical panels and dosing equipment should be arranged with sufficient clearance for safe operation and maintenance.

Safety

Floor drainage, ventilation, chemical storage and electrical protection must be designed together rather than treated as separate details.

Service access

Clearly labelled lines, removable connections and correctly positioned valves reduce intervention time and simplify future service.

Get engineering support for a new pool or an existing system.

Message on WhatsApp